10/19/20
LEWALLEN BRIDGE REPLACEMENT PROJECT UPDATE
Lynn Murphy (Project Coordinator)
At month 26 of the 36-month project
Crews continue preparing the bridge deck for concrete
Bridge Deck Drains
Drains spaced at engineered intervals are being installed where the drain gutter meets the concrete curb/sidewalk. This is time consuming work, as the recently installed deck rebar steel must be trimmed away to make room for the drainage structure, which must be set at the proper elevation. Read More…